000 00692pam a22002294a 4500
001 12433006
005 20251121120802.0
008 010606s2002 njua 001 0 eng
020 _a0130922013
020 _a9780130922014
050 0 0 _aTH438.4
_b.F45 2002
082 0 0 _a690/.068
_221
100 1 _aFeigenbaum, Leslie.
245 1 0 _aConstruction scheduling with Primavera Project planner /
_cLeslie Feigenbaum.
250 _a2nd ed.
260 _aUpper Saddle River, NJ :
_bPrentice Hall,
_cc2002.
300 _axii, 340 p. :
_bill. ;
_c29 cm.
500 _aIncludes index.
650 0 _aBuilding
_xSuperintendence.
650 0 _aProduction scheduling.
942 _2lcc
_cBK
_e2nd ed.
_n0
999 _c8297
_d8297